Google Link Bridge Google Link Bridge

Google Link Bridge

The Google Bridge project is a Design and Build contract with GIG as the main contractor.

It is a pedestrian bridge that will be 8 meters over Barrow Street and run from the main Google Docks building to Google Gasworks building and Gordon House at their 2nd floor level.  

GIG GmbH are responsible for the design and installation of the steel structure and glazing.  

Bennett are in control of the site set up, logistics, refurbishment works to the 3 Google buildings, internal finishes to the bridge and the Mechanical, Electrical and Sprinkler works.

The programme is 41 weeks for design and build.  The onsite works are programmed to take 18.

Project Details
Client: Gig GmbH
Cost: 1.7 million
Location: Ireland