Penneys GOH System Naas

Penneys GOH System Naas

Location

Ireland

Sector

Industrial

Duration

33 weeks

Size

16,000 m2

This project included installing a mezzanine structure & mechanised garment handling system in Penneys Warehouse Phase 2, Naas.  

The project consisted of the erection of 16,000m2 of mezzanine floors over 4 levels. There were 2 levels of mezzanine cold rolled structure and 2 levels of hot rolled structure, the works were carried out within an operational warehouse environment.
 

Project Team:
Client
Primark
Architect
Jack Collins Associates
Civil/Structural
DBFL
M&E Engineers
Synergy